Development of a predictive tool for flood impact assessment.

Or in other words… development of a predictive model from simulation capable of predicting potential flooding of the system for different precipitation scenarios

Due to climate change, rainfall events are becoming more intense, concentrating in short bursts of time and causing severe flooding. As such, it is necessary to study this important issue, determining the potential impact of flooding in a given area and what solutions can be proposed to mitigate its effects.

The main objective of the FLOODS project is to develop a predictive tool that allows quantifying the impact caused by a flood and proposing improvements in a risk area.

For this hydraulic modelling, both natural and artificial drainage will be taken into account, on which modifications can be proposed to improve runoff behaviour and reduce the resulting water depth. The main innovation lies in the development of an integrated system, i.e., a simulation model that considers the process variables governing surface conditions, along with surface water and sewage networks.

It is essential to have a predictive tool to support decision-making for infrastructure improvements based on flood risk. This will be calculated for different rainfall scenarios and will take into account the interaction between the surface draught and the stormwater runoff potential.

Results obtained: The FLOODS project has made it possible to develop a predictive tool to determine the impact of flooding in the area of the Grao and Marjalería de Castelló. This tool includes rainfall data from different return times, so that it is possible to study the impact generated for different situations. At the same time, the sewerage network is available in the tool, which turns out to be an indispensable element to be able to eliminate the water that runs through the streets of the model. Finally, the introduction of a modified elevation model makes it possible to have a real model, with the different heights of the streets, a fundamental aspect in order not to work on a flat model. From the combination of these parameters, the height of the sheet of water in the model generated is obtained, thus defining the most critical areas, being those in which the height of the sheet of water is highest. On the other hand, it has been determined which pipes of the collector lines are saturated, thus being able to identify them. Thus, based on the results generated, it has been possible to put forward a series of proposals for improvements that seek to reduce the impact of flooding.

Partners

FACSA

FACSA

Funding

Funded by the European Union within the framework of the European Regional Development Fund (ERDF) Programme Comunitat Valenciana 2021-2027 through the Line for the Promotion of R&D&I projects for Public Innovation Procurement tenders, with reference INNCP1/2023/1, and has a total budget of €57,068.12, and a grant awarded amounting to €28,534.06 from the Valencian Institute for Competitiveness and Innovation – IVACE+i Innovation.

Funding logos
Contact us
Facsa
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.